Davejm63
Member
I have a 9.8 on order with SRAM GX in radioactive orange.
Looking at the Trek website they no longer offer this spec and colour.
I have found a 9.8 XT in my size at another distributor with longer lead time (already at 84 days for my original order, from the agreed 70 days)
Do I keep original order or switch to XT with potential longer lead time ?
Looking at the Trek website they no longer offer this spec and colour.
I have found a 9.8 XT in my size at another distributor with longer lead time (already at 84 days for my original order, from the agreed 70 days)
Do I keep original order or switch to XT with potential longer lead time ?